| Wallis
& Stevens 'Wildfire' is close to completion, and has passed
her commissioning steam test and
is now on the rally scene in the Thames Valley area.
|
 |
|
|
|
The
new front axle for Burrell 2426, with the refurbished front
wheels, in the machine shop.
|
 |
|
|
|
The new boiler for Dougal
under steam test at it's working pressure of 150 psi.
the
reboilered loco is in traffic on the Evesham Vale Light Railway,
see our links page.
|
 |
|
|
| 15" gauge 4-6-2
locomotive boiler 'Prince William' soon after arrival for
repairs. |
 |
|
|
| Burrell no.2426 with
a new back axle, re-metalled axle boxes, assembled with
differential gears, prior to fitting of new tender. This engine is single drive, sprung only on the
back axle. |
 |
|
|
| The new tender for