|
The
new firebox fitted to Supreme, prior to the spotting through of
the stay holes from the outer wrapper.
|
 |
|
|
|
|
Fitting the foundation ring to a
newly riveted firebox.
|
 |
|
|
| The completed box for Aveling
R10 No. 5124 |
 |
|
|
|
Lowering the firebox assembly into
outer wrapper, the final assembly of the boiler complete.
|
 |
|
|
|
Ian Hatch preparing to squeeze
another foundation ring rivet for a good steam tight joint on
the 15" gauge new build boiler.
|
 |
|
|
| The inner firebox
assembly for the new build 15" gauge boiler ready to fit. |
 |
|
|
| New lower hornplate
patches fully welded in, belly tank brackets replaced, and all
four lower lap seams re-riveted on Fowler Super Lion 'SUPREME' |
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|